1 mm
Measured,
not assumed.
Every first article goes on the Zeiss CMM before the run starts, and the inspection report ships in the box with your parts.

±0.0001 in
First article
The first part of every run is measured on the CMM against a ballooned drawing before production starts.
In-process checks
Operators check every tenth part, and critical features run on statistical process control.
Final inspection
Every part gets a visual check, and dimensions are sampled to the AQL on your PO.
Paperwork
Certificate of conformance, material certs and an AS9102 first article report ship with the parts.
ISO 9001:2015
Quality management
AS9100D
Aerospace
ITAR registered
Defense work
NIST 800-171
Controlled data